MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Consider a well in which the annulus is full of 11.5 ppg fluid and the tubing is full of 7 ppg fluid. What should be done to reverse circulate the well with 11.5 ppg while maintaining the bottom hole pressure constant? |
| A. | Hold tubing pressure constant while circulating |
| B. | Hold the pressure inside the packer constant |
| C. | Hold casing pressure constant while reverse circulate |
| D. | Hole casing pressure constant until one tubing volume is reached and then hold tubing pressure constant |
| Answer» D. Hole casing pressure constant until one tubing volume is reached and then hold tubing pressure constant | |
| 2. |
Calculate the kill weight required to kill the well where the shut-in tubing pressure is 4500 psi, top of perforation is 12000 Measured depth/ 10000 True vertical depth and the formation fluid density is 2 ppg? |
| A. | 10.5 ppg |
| B. | 10.7 ppg |
| C. | 10.9 ppg |
| D. | Component-based |
| Answer» C. 10.9 ppg | |
| 3. |
What is the main function of the subsurface safety valve? |
| A. | Always Controls production rate |
| B. | Shut the well in case of emergency |
| C. | Shut the well in before removing wireline lubricator |
| D. | Allows the formation of fluid influx |
| Answer» C. Shut the well in before removing wireline lubricator | |
| 4. |
An oil well is having a true vertical depth of 10000 ft and measured depth of 12000 ft. the tubing shut-in pressure is 500 psi and the weight of the fluid in the tubing is 4 ppg. Calculate the formation gradient in psi/ft of the well? |
| A. | 0.354 |
| B. | 0.454 |
| C. | 0.2 |
| D. | 0.258 |
| Answer» E. | |
| 5. |
Wellbore influx is easier to detect in oil-based mud as compared to water-based mud. |
| A. | True |
| B. | False |
| Answer» C. | |