MCQOPTIONS
Saved Bookmarks
This section includes 7 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
What is the Bottom hole regulator in well completions? |
| A. | Reheat the flow stream |
| B. | Allows Hydrate formation |
| C. | Used to set the packer at the desired depth |
| D. | Used to lower the Bottom Hole Flowing Pressure |
| Answer» B. Allows Hydrate formation | |
| 2. |
The full form of SSS in petroleum production is _____ |
| A. | Safety Surface System |
| B. | Surface Safety System |
| C. | Safety System on Surface |
| D. | Safety System on Subsurface |
| Answer» C. Safety System on Surface | |
| 3. |
The full form of SCSV in petroleum production is _____ |
| A. | Subsurface controlled security valve |
| B. | Subsurface controlled safety valve |
| C. | Surface controlled security valve |
| D. | Surface controlled safety valve |
| Answer» E. | |
| 4. |
Bridge plug is only used to shut-in the entire well. |
| A. | True |
| B. | False |
| Answer» C. | |
| 5. |
What is the full form of PRV in well completion? |
| A. | Pressure Release Valve |
| B. | Project Running Value |
| C. | Pressure Relief Valve |
| D. | Pressure Release Value |
| Answer» D. Pressure Release Value | |
| 6. |
Surface Safety System is the protection system against mishaps in surface facilities. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 7. |
What is Catastrophe System? |
| A. | Well Completion technique |
| B. | Artificial lift technique |
| C. | Pressure Gauge system |
| D. | Down-hole shut-in system |
| Answer» E. | |