| 1. |
Which of the following are not the benefits of the Pressure Drawdown test over the Pressure Build up test? |
| A. | Production continues during the test period |
| B. | Reservoir volume in communication with the wellbore can be estimated |
| C. | Production continues during the test period as well as Reservoir volume in communication with the wellbore |
| D. | Production ceases during the test period |
| Answer» E. | |
| 2. |
Which of the following is Miller- Dyes- Hutchinson equation? |
| A. | Pws = Pi – (162.6qμB/kh)* log((tp + Δt)/Δt) |
| B. | Pws = Pi – (141.2qμB/kh)* log((tp + Δt)/Δt) |
| C. | Pws = P1hr + (162.6qμB/kh).log(Δt) |
| D. | Pws = P1hr + (141.2qμB/kh).log(Δt) |
| Answer» C. Pws = P1hr + (162.6qμB/kh).log(Δt) | |
| 3. |
Damage Ratio is the inverse of the Flow efficiency. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 4. |
How can be the pressure drop across the skin is calculated (all signs have their original meanings)? |
| A. | ΔPskin= 141.2qμBs/kh |
| B. | ΔPskin=141.2qkh/μBs |
| C. | ΔPskin=141.2qμks/Bh |
| D. | ΔPskin=162.2qμBs/kh |
| Answer» B. ΔPskin=141.2qkh/μBs | |
| 5. |
What is the type of fluid flow state showing on the diagram below? |
| A. | Steady state flow |
| B. | Unsteady state flow |
| C. | Semi-steady state flow |
| D. | Vertical flow |
| Answer» D. Vertical flow | |
| 6. |
For Pseudo- Steady state flow which of the following is correct in which P,t represents Pressure and time respectively? |
| A. | dP/dt =0 |
| B. | dP/dt =constant |
| C. | dP/dt =infinity |
| D. | dP/dt =1 |
| Answer» E. | |