1.

The long term use of ERP could change the border organization in terms of its_____.

A. enterprise.
B. structure
C. function. .
D. structure and function
Answer» E.
2.

Testing the links between ERP packages and other corporate software links thathave to be building on a______________ basis.

A. sample.
B. case-to-case.
C. random.
D. time.
Answer» C. random.
3.

_________ should determine the characteristic of the current system beforeimplementation.

A. decision makers.
B. project team members.
C. decision makers and project team members.
D. management.
Answer» D. management.
4.

Users with heavy data analysis needs should include the cost of _________ inthe ERP budget.

A. software.
B. analysis tool.
C. data warehouse.
D. hardware.
Answer» D. hardware.
5.

____________ oversee the day-to-day operations of respective functionalareas during ERP implementation.

A. consultant.
B. package vendor.
C. end users.
D. functional managers
Answer» E.
6.

During the ___________ session the reengineering must also consider newtechnologies.

A. planning
B. implementing.
C. brainstorming.
D. training.
Answer» D. training.
7.

The __________ planning features of most ERP systems offer, both roughcut and detailed capacity planning.

A. capacity.
B. production.
C. marketing.
D. test.
Answer» B. production.
8.

For training the employees will be divided into groups based ontheir_____________.

A. qualification. .
B. department.
C. computer knowledge.
D. current skill levels
Answer» E.
9.

________________ is the people who will be using the ERP system once it is inplace.

A. management.
B. end-user.
C. consultant.
D. vendor.
Answer» C. consultant.
10.

In order to reduce the lead times, the organization should have an efficient__________ system.

A. purchasing.
B. production planning.
C. inventory.
D. integrated inventory.
Answer» E.
11.

The company should conduct a _________ about the implementation andimplementation strategies.

A. feasibility study.
B. survey.
C. case study.
D. test.
Answer» B. survey.
12.

Normally the ERP package needs ________ of company's functionalrequirements.

A. 50%.
B. 60%.
C. 80%.
D. 100%.
Answer» D. 100%.
13.

ASAP road-map is a detailed project plan by _______ that describes all activitiesin an implementation.

A. sap.
B. oracle.
C. peoplesoft.
D. baan.
Answer» B. oracle.
14.

_________ approaches reduces data redundancy and provide updateinformation.

A. legacy system.
B. information system.
C. integrated data model.
D. data base.
Answer» D. data base.
15.

________ module facilitates the process of maintaining the appropriate level ofstock in a warehouse.

A. hr.
B. project planning.
C. material management.
D. purchasing.
Answer» D. purchasing.
16.

The elapsed time between placing an order and it receiving it is also knownas _____.

A. elapsed time.
B. waiting time.
C. time interval.
D. expected time.
Answer» B. waiting time.
17.

Once the ERP system is implemented the current ______________ will bereplaced by new ones.

A. process.
B. procedures.
C. techniques.
D. process and procedures.
Answer» E.
18.

________ departments use OLAP for applications such as budgeting, activitybased costing and so on.

A. financial.
B. marketing.
C. purchasing.
D. sales.
Answer» B. marketing.
19.

One of the objectives of executive committee meeting is to address the issuesthat involve _______.

A. planning phase.
B. testing phase.
C. decisions from the top management.
D. training.
Answer» D. training.
20.

___________ is responsible for administering each of the phases of theimplementation.

A. vendors.
B. consultants.
C. administrative team members.
D. technical support team.
Answer» C. administrative team members.
21.

In _________, entire organization is considered as a system and thedepartments are its subsystem.

A. business way.
B. general.
C. enterprise way.
D. planning.
Answer» D. planning.
22.

__________ is the task of identifying a finite set of most categories the dataset.

A. predicting.
B. classification.
C. deviation detection.
D. clustering.
Answer» E.
23.

The _________ model fails in creating the integrated information environment inbusiness.

A. traditional information.
B. modern information.
C. erp.
D. computerized.
Answer» B. modern information.
24.

Using __________ system, business can gain effective control overengineering change orders.

A. engineering change control.
B. engineering change order.
C. inventory.
D. production planning.
Answer» B. engineering change order.
25.

_________ sub-system allows the company to analyze financial transactions fora given period.

A. cash management.
B. treasury management.
C. investment management.
D. treasury module.
Answer» B. treasury management.
26.

Which team is responsible for the activities such as data migration, back up andrecovery?

A. executive committee.
B. administrative team. .
C. project management.
D. technical support team
Answer» E.
27.

During analysis it is important to investigate ____________ of the differentpackages.

A. effectiveness.
B. worth.
C. cost.
D. origin.
Answer» E.
28.

The reengineering team must consider _________ in the redesign of aprocess.

A. all resources.
B. all process stakeholders.
C. existing system.
D. legacy system.
Answer» C. existing system.
29.

________ information is computed data that usually reflects complexrelationships.

A. database.
B. just-in-time.
C. real.
D. processed.
Answer» C. real.
30.

___________ focus on the process of communicating, teaching, demonstratingand configuring software for thebusiness process flows.

A. management consultants.
B. application consultants.
C. package vendors.
D. functional participants.
Answer» C. package vendors.
31.

__________ used to support the old process to become useful in the newprocess, involves reducing somerequirements while expanding others.

A. transitioning the information.
B. software management.
C. front-office software.
D. information system.
Answer» B. software management.
32.

In the case of make-to-order items, the ERP systems save time byintegrating with _______ systems.

A. engineering change control.
B. engineering change order.
C. cad and cam.
D. cad.
Answer» D. cad.
33.

During ERP implementation __________ should be converted into tasks andshould be allocated to the rightpeople.

A. rules.
B. procedures.
C. methodologies.
D. functionality
Answer» D. functionality
34.

The ______________ team is comprised of the technical leader and theexecutive committee head.

A. project management.
B. executive committee. .
C. work.
D. administrative support
Answer» B. executive committee. .
35.

The data warehouse archives contain __________ of significant, continuinginterest and value to the enterprise.

A. new data.
B. current data.
C. old data.
D. meta data.
Answer» D. meta data.
36.

The __________ used by the data mining for the creation of informationabout data.

A. data verification.
B. data validation.
C. discovery model.
D. analysis model.
Answer» D. analysis model.
37.

A data warehouse is a collection of _________ that is critical to thesuccessful execution of enterprise initiatives.

A. raw data.
B. tables.
C. computer based information.
D. reports.
Answer» D. reports.
38.

The _________ approach emphasizes the human element of necessary changewithin organizations.

A. olap.
B. data mining.
C. data warehousing.
D. bpr.
Answer» E.
39.

In which phase the actual users of the system will be given training on how touse the system?

A. gap analysis.
B. reengineering.
C. implementation team training.
D. end user training.
Answer» E.
40.

Which process makes the decision makers to get accurate information, in whichformat they want?

A. decision making.
B. planning.
C. design.
D. testing.
Answer» B. planning.
41.

Non technical employees and managers can act as functional experts during______.

A. post implementation.
B. pre-implementation.
C. implementation.
D. training.
Answer» C. implementation.
42.

The consultant should differentiate __________ and decide on the level ofcustomization.

A. requirements and must have.
B. requirements and nice to have.
C. must have and nice to have.
D. requirements and tasks
Answer» D. requirements and tasks
43.

All basic definitions of information and data modeling will be made in ______phase.

A. pre-implementation.
B. post implementation.
C. defining solutions.
D. going live.
Answer» D. going live.
44.

The company's objective is to make the package work successfully asdocumented in the _______ manual.

A. vendor\s.
B. consultant\s.
C. management\s.
D. technical support team\s.
Answer» B. consultant\s.
45.

Who will point out the issues that are specific to the company during ERPimplementation?

A. in-house team.
B. management.
C. vendor.
D. end-user.
Answer» B. management.
46.

A successful training will account for a minimum of ______of the total projectcost.

A. 10-15%.
B. 10-20%.
C. 5-10%.
D. 5-15%
Answer» B. 10-20%.
47.

Material Requirement Planning(MRP) utilizes software applications forscheduling _________.

A. sales management.
B. production processes.
C. marketing techniques.
D. human resource management.
Answer» C. marketing techniques.
48.

Data mining is a powerful new technology to __________ from largedatabases.

A. extraction of hidden predictive information.
B. generating reports.
C. retrieving data.
D. show result.
Answer» B. generating reports.
49.

The ________ team will contain people from the company's IT/EDPdepartments.

A. in-house.
B. executive.
C. administrative.
D. technical support.
Answer» B. executive.
50.

__________ streamlines procurement of required raw material.

A. marketing module. .
B. financial module.
C. manufacturing module.
D. purchasing module.
Answer» E.