| 1. |
In PERT network analysis, the critical path is defined as |
| A. | a path with sum of duration of all activities having positive slack values. |
| B. | a path with smallest sum of duration of activities on it. |
| C. | a path with nodes having positive slack values. |
| D. | a path with nodes having zero slack values. |
| Answer» E. | |