This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Construction Cost Estimation knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
In the cubical contents method, the cost of a structure is computed by the multiplication of total cubic contents and _______ |
| A. | Area of building |
| B. | Volume of building |
| C. | Local cubic rate |
| D. | Length of building |
| Answer» D. Length of building | |
| 2. |
In the plinth area method, the cost of construction is computed by the multiplication of ________ |
| A. | Plinth length and rate |
| B. | Plinth breadth and rate |
| C. | Plinth area and plinth area rate |
| D. | Plinth volume and plinth length rate |
| Answer» D. Plinth volume and plinth length rate | |
| 3. |
In the case of works which require some special types of equipment, an amount of ______ percent of the estimated cost is given. |
| A. | 1-2 |
| B. | 5-9 |
| C. | 12-18 |
| D. | 16-20 |
| Answer» B. 5-9 | |
| 4. |
While fixing rate per unit of an item, the quantity of materials and labour needed for one unit of an item are strictly per __________ |
| A. | Special Data Book |
| B. | Standard Data Book |
| C. | Special Data Record |
| D. | Specific Data Record |
| Answer» C. Special Data Record | |
| 5. |
The process of working out the cost per unit of each item is known as _________ |
| A. | Work |
| B. | Sheet |
| C. | Data |
| D. | Analysis |
| Answer» D. Analysis | |