MCQOPTIONS
Saved Bookmarks
This section includes 8 Mcqs, each offering curated multiple-choice questions to sharpen your Prestressed Concrete Structures knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
To attain the composite action the precast stem and the flange is ____________ |
| A. | Laced together |
| B. | Tied together |
| C. | Keyed together |
| D. | Cutted together |
| Answer» D. Cutted together | |
| 2. |
The main components of the composite beam are prestressed precast stem and ____________ |
| A. | A cast insitu flange |
| B. | A cast insitu beam |
| C. | A cast insitu slab |
| D. | A cast insitu column |
| Answer» B. A cast insitu beam | |
| 3. |
The combination of light weight concrete for the cast insitu slab results in reduced ____________ |
| A. | Live loads |
| B. | Dead loads |
| C. | Constant loads |
| D. | Limited loads |
| Answer» C. Constant loads | |
| 4. |
The efficient utilization of material in a composite section in which the low and medium strength concrete resists? |
| A. | Tensile forces |
| B. | Principal forces |
| C. | Compressive forces |
| D. | Axial forces |
| Answer» D. Axial forces | |
| 5. |
In many cases precast prestressed unit serve as ____________ |
| A. | Supports and dispences |
| B. | Girders and dispences |
| C. | Area and dispences |
| D. | Beams and dispences |
| Answer» B. Girders and dispences | |
| 6. |
Due to the effect of composite action sizes of precast prestressed units can be ______________ |
| A. | Increased |
| B. | Reduced |
| C. | Deducted |
| D. | Serviced |
| Answer» C. Deducted | |
| 7. |
The Composite construction was first tries for a motorway bridge? |
| A. | 1940 |
| B. | 1945 |
| C. | 1960 |
| D. | 1980 |
| Answer» B. 1945 | |
| 8. |
The composite sections provide one monolithic action between ______________ |
| A. | Prefabricated units |
| B. | Post fabricated units |
| C. | Pasteurized units |
| D. | Tensioned units |
| Answer» B. Post fabricated units | |