MCQOPTIONS
Home
About Us
Contact Us
Bookmark
Saved Bookmarks
Testing Subject
General Aptitude
Logical and Verbal Reasoning
English Skills Ability
Technical Programming
Current Affairs
General Knowledge
Finance & Accounting
GATE (Mechanical Engineering)
Chemical Engineering
→
Statistical Quality Control
→
Process Capability Analysis Using Histogram Probability Plot
→
Which of these should be plotted on the x bar char...
1.
Which of these should be plotted on the x bar chart?
A.
Counts
B.
Defects
C.
Problems Solved
D.
Measurements
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Which of these should be plotted on the x bar chart?
A permanent change in the sample size is made only because of cost or because has exhibited good stability and fewer resources are allocated for process monitoring.
If the means for sample 1 to 4 for a process are, 12.67, 22.32, 14.53, 12.11; what value will be the center line of chart indicating?
A mixture pattern in the control chart points is exhibited when __________ occurs.
Slope of OC curve for x bar chart will _________ when sample size is increased.
If - risk of any process is 0.75, what will be the ARL for that process?
The probability of not detecting an in-control shift of the mean of the process is said to be the _____
The assumption that links normality to the control charts is ___________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies