MCQOPTIONS
Saved Bookmarks
| 1. |
When .is used on the basis of budgeted overheads and the rate is applied to the actual base, the actual overhead expenses may be different from the charged overheads. |
| A. | a predetermined rate |
| B. | actual rate method of absorption |
| C. | both a & b |
| D. | none of these |
| Answer» B. actual rate method of absorption | |