MCQOPTIONS
Saved Bookmarks
| 1. |
What are the two methods to construct the cement concrete slab? |
| A. | Alternative method and continuative method |
| B. | Alter bay method and continuing bay method |
| C. | Alternate bay method and continuous bay method |
| D. | Altering method and continuity method |
| Answer» D. Altering method and continuity method | |