MCQOPTIONS
Home
About Us
Contact Us
Bookmark
Saved Bookmarks
Testing Subject
General Aptitude
Logical and Verbal Reasoning
English Skills Ability
Technical Programming
Current Affairs
General Knowledge
Finance & Accounting
GATE (Mechanical Engineering)
Chemical Engineering
→
Highway Engineering
→
Embankment Subgrade
→
The utility unit as per saturation system for a p...
1.
The utility unit as per saturation system for a population of less 1001 to 2000 is?
A.
0.25
B.
0.50
C.
1.00
D.
2.00
Answer» D. 2.00
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The utility unit as per saturation system for a population of less 1001 to 2000 is?
The final step after fixing the optimum length of the road is?
The determination of optimum length is based on ______________
The master plan may not be prepared for ______________
The accident cost analysis is estimated by conducting ______________
Planning is based on _______________
THE_FINAL_STEP_AFTER_FIXING_THE_OPTIMUM_LENGTH_OF_THE_ROAD?$
The_utility_unit_as_per_saturation_system_for_a_population_of_less_1001_to_2000_is$
The determination of optimum length is based o?
The master plan may not be prepared for
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies