The switch to backup power must be completed withi...
1.
The switch to backup power must be completed within a deadline of
A.
50 ms
B.
55 ms
C.
70 ms
D.
100 ms
Answer» B. 55 ms
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
IF_YOU_DETECT_POWER_FAILURE_BY_MONITORING_A_VOLTAGE_LEVEL,_YOU_HAVE_TO_MAKE_MORE_THAN_ONE_OBSERVATION_TO_DETECT_THAT_THE_VOLTAGE_IS_DROPPING.?$
The_average_execution_time_of_the_power_monitor_process_should_be_less_than$
Periodic occur irregularly and unpredictably and are usually signaled using the computer’s interrupt mechanism?#
An example of a system that may use a process pipeline is a _________
The switch to backup power must be completed within a deadline of
The times by which stimuli must be processed and some response produced by the system is known as
RTOS stands for
Which of the following is not a real-time architectural pattern
Which of the following activities may be included in a real-time software design process?
Which of the following is a category of a stimuli?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies