The reduction in project time normally results in_______________? |
| A. | decreasing the direct cost and increasing indirect cost |
| B. | increasing the direct cost and decreasing the indirect cost |
| C. | increasing the direct cost and indirect cost both |
| D. | decreasing the direct cost and indirect cost both |
| Answer» C. increasing the direct cost and indirect cost both | |