MCQOPTIONS
Saved Bookmarks
| 1. |
The expected out turn of 2.5 cm cement concrete floor per manson per day? |
| A. | 1.5 sq. m |
| B. | 0.5 sq. m |
| C. | 7.5 sq. m |
| D. | 2.5 sq. m |
| Answer» D. 2.5 sq. m | |