| 1. |
The Dulac Box plant produces 500 cypress packing boxes in two 10-hour shifts. What is the productivity of the plant? |
| A. | 25 boxes/hr |
| B. | 50 boxes/hr |
| C. | 5000 boxes/hr |
| D. | none of the above |
| Answer» B. 50 boxes/hr | |