The cross sections should be drawn for every ____...
1.
The cross sections should be drawn for every __________
A.
10m
B.
20m
C.
50m
D.
100m
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Highway should be planned for __________
The planning, design and construction of either a network of new roads or road link is called __________
The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as __________
The approximate cost of construction evaluated for the project is called __________
The cross sections should be drawn for every __________
The index map shows __________
The New highway project is divided into how many stages?
Highway should be planned for
The planning, design and construction of either a network of new roads or road link is called
The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies