The chance and assignable cause terminology was d...
1.
The chance and assignable cause terminology was developed by _______
A.
Deming
B.
Hawthorne
C.
ISO
D.
Shewhart
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Type I error is described as the situation of the conclusion of the process state as out-of-control when it is in-control.
Control charts can be used very effectively in the process of hypothesis testing.
OC curve can be used to determine the probability of _______
The chance and assignable cause terminology was developed by _______
Chance causes of variation are also called ________ and assignable causes are also called _______
If a process has its operation with _________ causes of variation, it is said to be an out-of-control process.
Which of these is not a part of SPC’s 7 tools?
A process is said to be in the statistical control if it operates with ______ of variation.
Shifting of mean from the current value to a new value and remaining there, is called _____ shift of the mean.
If for a process, 18 out of 20 points are plotted above the CL but below the upper control limit, and only 2 of 20 are plotted between the center line and the lower control limit, what can we say about the process state?
Reply to Comment
×