MCQOPTIONS
Home
About Us
Contact Us
Bookmark
Saved Bookmarks
Testing Subject
General Aptitude
Logical and Verbal Reasoning
English Skills Ability
Technical Programming
Current Affairs
General Knowledge
Finance & Accounting
GATE (Mechanical Engineering)
Chemical Engineering
→
Pavement Design
→
Bituminous Material Tests 1
→
The bump integrator is towed by a jeep at a const...
1.
The bump integrator is towed by a jeep at a constant speed of ______
A.
30 km/h
B.
32 km/h
C.
35 km/h
D.
40 km/h
Answer» C. 35 km/h
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
What is the name of the system designed by Data Collection Ltd. to collect various data about the pavement surface?
The bump integrator is towed by a jeep at a constant speed of ______
What does PSR stand for?
What is the name of the serviceability index developed using mathematical models?
The pavement serviceability concept was introduced at the ______
The higher the skid score, lower is the skid resistance.
The transverse profile is evaluated in terms of ______
How is the testing of skid resistance carried out using the skid truck?
What is the term used to evaluate the skid resistance of the pavement?
The pavement unevenness cannot be measured using which of the below equipment?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies