MCQOPTIONS
Saved Bookmarks
| 1. |
Scheduling shows: |
| A. | Total cost of production |
| B. | Total material cost |
| C. | Which resource should do which job and when |
| D. | The flow line of materials |
| Answer» D. The flow line of materials | |