MCQOPTIONS
Saved Bookmarks
| 1. |
__________ maintained in the SNP PPM or Transportation Lane determines the Availability Date of a Receipt element within a time bucket (period). |
| A. | Master Factor |
| B. | Time Factor |
| C. | Period Factor |
| D. | Both B and C |
| Answer» D. Both B and C | |