In a software project, COCOMO (Cost Constructive Model) is used to estimate |
| A. | Effort and duration based on the size of the software |
| B. | Size and duration based on the effort of the software |
| C. | Effort and cost based on the size of the software |
| D. | Size, effort and duration based on the size cost of the software |
| Answer» E. | |