In a software project, COCOMO (Cost Constructive Model) is used to estimate

A. Effort and duration based on the size of the software
B. Size and duration based on the effort of the software
C. Effort and cost based on the size of the software
D. Size, effort and duration based on the size cost of the software
Answer» E.