If work of piling is to be carried out at night, m...
1.
If work of piling is to be carried out at night, minimum........... 'lux luminance lights should be used.
A.
60
B.
200
C.
150
D.
100
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
In which of the following contract; contractor is required to offer a fixed sum for job in all respect as per given drawings and details?
The construction industry has accounted for about ............% of all deaths due to accident at place of work
Full width of road should be taken for bituminous work at a time so that job is completed in time.
Who should be allowed to go below slab when centering is in position and concreting of slab is going on
Before starting piling work, a complete knowledge of underground structures (such as sewers, water pipeline, gas mains etc.) is essential.
If work of piling is to be carried out at night, minimum........... 'lux luminance lights should be used.
Economic cost is the only reason for which a contractor should be conscious of construction safety.
The coarse aggregates of different sizes like 5 to 10 mm, 10 to 20 mm, 20 to 40 mm etc. should be stored in different piles.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies