MCQOPTIONS
Saved Bookmarks
| 1. |
If the time taken for the moisture removal is obtained from the formulaTime = Ss(Xc Xe)/ Nc * A ln ((X1-Xe)/(X2-Xe)) then the falling curve will be curves symmetrically |
| A. | nWhere, Ss= Wet solid weight |
| B. | n Xc,Xe- constant & equilibrium moisture content |
| C. | n X1,X2 initial and final moisture content |
| D. | True |
| E. | False |
| Answer» C. n X1,X2 initial and final moisture content | |