For precision work the illumination level required is of the order of |
| A. | 500 to 1000 lumens/m2 |
| B. | 50 to 100 lumens/m2 |
| C. | 200 to 400 lumens/m2 |
| D. | 10 to 25 lumens/m2 |
| Answer» B. 50 to 100 lumens/m2 | |