MCQOPTIONS
Saved Bookmarks
| 1. |
For 2.5 cm c.c. floor for 100 sq m of area and 10% for contingency what amount of cement concrete will be required? |
| A. | 5.75 cu m |
| B. | 2.75 cu m |
| C. | 2.5 cu m |
| D. | 5.0 cu m |
| Answer» C. 2.5 cu m | |