MCQOPTIONS
Home
About Us
Contact Us
Bookmark
Saved Bookmarks
Testing Subject
General Aptitude
Logical and Verbal Reasoning
English Skills Ability
Technical Programming
Current Affairs
General Knowledge
Finance & Accounting
GATE (Mechanical Engineering)
Chemical Engineering
→
Construction Materials
→
Water Leakage
→
A ___________ consists of a watertight pipe of dia...
1.
A ___________ consists of a watertight pipe of diameter about 250 mm to 300 mm.
A.
Hopper
B.
Grout
C.
Bucket
D.
Tremie
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The ___________ are open at top and their bottoms are provided with openable doors.
In cold weather conditions, the temperature of concrete should not be allowed to fall below ___________ for at least 3 days after its placing.
While placing concrete in hot weather, the aggregate should be _____________ to bring down the temperature of concrete.
It is observed that in cold weather, the curing is _________ in the initial stages of the setting of concrete.
The _________ is a mixture of cement and sand, the usual proposition being 1:3.
The ____________ is the most effective process of repairing concrete work which has been damaged due to enquiry work or other reasons.
__________ method is not in common use in case of placing concrete underwater.
A _____________ is provided at the top of the Tremie to receive the concrete.
A ___________ consists of a watertight pipe of diameter about 250 mm to 300 mm.
The concrete is contained in a timber or steel casing for a certain period after its placing, this casing is known as the ____________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies