51.

Computers are used in Production control in this area:

A. Follow-up activity
B. To control labour
C. To disseminate information
D. Loading, Scheduling and Assignment works.
Answer» E.
52.

Final stage of production planning, where production activities are coordinated andprojected on a time scale is known as:

A. Scheduling
B. Loading
C. Expediting
D. Routing
Answer» B. Loading
53.

Which one of the following establishes time sequence of operations?

A. Routing
B. Sequencing
C. Scheduling
D. Dispatching
Answer» D. Dispatching
54.

Identify which one of the following is NOT the objective of the maintenance:

A. To keep all production facilities and allied facilities in an optimum working condition.
B. To ensure specified accuracy to products and time schedule of delivery to customers.
C. To keep the down time of the machine at the maximum.
D. To keep the production cycle within the stipulated range.
Answer» D. To keep the production cycle within the stipulated range.
55.

The time by which an activity can be rescheduled without affecting the otheractivities - preceding or succeeding is called as

A. Slack
B. Independent Float
C. Free Float
D. Total Float
Answer» C. Free Float
56.

One of the product examples for Line layout is:

A. Repair workshop
B. Welding shop
C. Engineering College
D. Cement.
Answer» E.
57.

The range of Long range forecasting period may be approximately:

A. 1 to 2 weeks
B. 2 to 3 months
C. 1 year
D. above 5 years
Answer» E.
58.

To plan for future man power requirement:

A. Short term forecasting is used
B. Long range forecasting is used
C. Medium range forecasting is used
D. There is no need to use forecasting, as future is uncertain.
Answer» C. Medium range forecasting is used
59.

The study of relationship between the load on hand and capacity of the work centersis known as:

A. Scheduling
B. Loading
C. Routing
D. Controlling
Answer» C. Routing
60.

In Process Planning we plan:

A. Different machines required
B. Different operations required
C. We plan the flow of material in each department
D. We design the product.
Answer» D. We design the product.
61.

The following establishes time sequence of operations:

A. Routing
B. Sequencing
C. Scheduling
D. Dispatching
Answer» D. Dispatching
62.

Use of any process or procedure designed to transform a set of input elements into aset of output elements is known as:

A. Transformation process
B. Transformation of input to output
C. Production
D. Technology change
Answer» D. Technology change
63.

Variety reduction is generally known as:

A. Less varieties
B. Simplification
C. Reduced varieties
D. None of the above
Answer» C. Reduced varieties
64.

Z-chart can be used to show:

A. Process used in production
B. Quality level of the product
C. Both the plan and the performance, and deviation from the plan
D. To show cost structure of the product.
Answer» D. To show cost structure of the product.
65.

The desired objective of Production and Operations Management is:

A. Use cheap machinery to produce
B. To train unskilled workers to manufacture goods perfectly
C. Optimal utilisation of available resources
D. To earn good profits.
Answer» D. To earn good profits.
66.

In Operation Planning:

A. The planner plans each operation to be done at work centers and the sequence of operations
B. Decide the tools to be used to perform the operations
C. Decide the machine to be used to perform the operation,
D. Decide the materials to be used to produce the product.
Answer» B. Decide the tools to be used to perform the operations
67.

One of the activities of expediting is:

A. To file the orders in sequence
B. To decide the sequence of operation
C. To record the actual production against the scheduled production
D. To examine the tools used in production
Answer» D. To examine the tools used in production
68.

In general number of product varieties that can be manufactured in Flow productionis:

A. One only
B. Ten to twenty varieties
C. Large varieties
D. Five only.
Answer» B. Ten to twenty varieties
69.

With reference to Aggregate Planning, identify which of the following statements is NOT correct?

A. It is an Intermediate-term planning.
B. It is made operational through a master schedule, which gives the manufacturing schedule.
C. Facility planning and scheduling are closely related with the aggregate planning.
D. It deals with the strategic decisions, such as purchase of facilities, introduction of new products, processes, etc.
Answer» E.
70.

One of the important production documents is:

A. Design sheet of the product
B. List of materials
C. Route card
D. Control chart
Answer» D. Control chart
71.

When work centers are used in optimal sequence to do the jobs, we can:

A. Minimise the set up time
B. Minimse operation time
C. Minimise the breakdown of machines
D. Minimise the utility of facility.
Answer» B. Minimse operation time
72.

MRP stands for:

A. Material requirement planning
B. Material reordering planning
C. Material requisition procedure
D. Material recording procedure
Answer» B. Material reordering planning
73.

The difference between product system and project system is:

A. Project system the equipment and machinery are fixed where as in product system they are movable
B. In Product system the machinery and equipment are fixed and in project system they are not fixed
C. Project system produces only standardized products and product system produces only unstandardised products
D. Products cannot be stocked whereas projects can be stocked.
Answer» C. Project system produces only standardized products and product system produces only unstandardised products
74.

Which one of the following standards is associated with the "Quality Assurance in FinalInspection Test"?

A. ISO 9001
B. ISO 9002
C. ISO 9003
D. ISO 9004
Answer» D. ISO 9004
75.

The act of going round the production shop to note down the progress of work andfeedback the information is known as:

A. Follow up
B. Dispatching
C. Routing
D. Trip card
Answer» B. Dispatching
76.

Effective capacity can NOT be determined by which of the following factors?

A. Product design and product-mix
B. Quantity and quality capabilities
C. Facilities
D. None of the above
Answer» E.
77.

Tempering is a process of:

A. Joining
B. Heat Treatment
C. Surface Treatment
D. Forming
Answer» C. Surface Treatment
78.

With reference to project management, identify which of the following statement is NOT correct?

A. Gantt chart is a principal tool used in scheduling and also in some methods of loading.
B. Routing is the first step in the production planning.
C. The cost of any activity is proportional to its time of completion.
D. The free float can be calculated by subtracting EFT from EST.
Answer» E.
79.

Which of the following stages of Product Life Cycle does attribute beginning ofsubstantial increase in Sales and Profits?

A. Introduction
B. Growth
C. Maturity
D. Decline
Answer» C. Maturity
80.

In which of the following stages the management should try to change its approachby changing its strategy from "buy my product" to "try my product"?

A. Introduction
B. Growth
C. Maturity
D. Decline
Answer» C. Maturity
81.

Line of Best fit is another name given to:

A. Method of Least Squares
B. Moving average method
C. Semi average method
D. Trend line method
Answer» B. Moving average method
82.

The card which is prepared by the dispatching department to book the labourinvolved in each operation is:

A. Labour card
B. Wage card
C. Credit card
D. Job card.
Answer» C. Credit card
83.

Conversion of inputs into outputs is known as

A. Application of technology
B. Manufacturing products
C. Product
D. Operation management
Answer» E.
84.

One of the aims of loading is:

A. To finish the job as early as possible
B. To minimise the material utilization
C. To improve the quality of product
D. To keep operator idle time, material waiting time and ancillary machine time at
Answer» E.
85.

In an organisation the production planning and control department comes under:

A. Planning department
B. Manufacturing department
C. Personal department
D. R & D department.
Answer» C. Personal department
86.

Conducting occasional check-ups of the products manufactured or assembled toensure high quality of the production is known as:

A. Planning
B. Scheduling
C. Inspection
D. Routing
Answer» D. Routing
87.

Important factor in forecasting production is:

A. Environmental changes
B. Available capacity of machines
C. Disposable income of the consumer
D. Changes in the preference of the consumer.
Answer» C. Disposable income of the consumer
88.

Arrangement of machines depending on sequence of operations happens in:

A. Process Layout
B. Product Layout
C. Hybrid Layout
D. Group Technology Layout.
Answer» C. Hybrid Layout
89.

The first stage in production planning is:

A. Process planning
B. Factory planning
C. Operation planning
D. Layout planning
Answer» C. Operation planning
90.

Conversion of inputs into outputs is known as:

A. Application of technology
B. operations management
C. Manufacturing products
D. product
Answer» D. product
91.

Out of the following trends in production/operations management, which one issometimes called as agile manufacturing?

A. Re-engineering
B. Supply-Chain Management
C. Lean Production
D. Flexibility
Answer» E.
92.

Manufacturing system often produces:

A. Standardised products
B. Standardised products in large volumes
C. Substandardproducts in large volumes
D. Products and services in limited volume.
Answer» B. Standardised products in large volumes
93.

Scheduling deals with:

A. Number of jobs to be done on a machine
B. Number of machine tools used to do a job
C. Different materials used in the product
D. Fixing up starting and finishing times of each operation in doing a job
Answer» E.
94.

In aggregate planning one of the methods used to modification of supply is:

A. Advertising and sales promotion
B. Development of complimentary products
C. Backlogging
D. Hiring and lay off of employees depending on the situation.
Answer» E.
95.

In Continuous manufacturing system, we need:

A. General purpose machines and Skilled labours
B. Special machine tools and highly skilled labours
C. Semi automatic machines and unskilled labours
D. General purpose machines and unskilled labours.
Answer» C. Semi automatic machines and unskilled labours
96.

Which of the following aims at finding the best and most efficient way of using theavailable resources—men, materials, money and machinery?

A. Method Study
B. Work Study
C. Time Study
D. Motion Study
Answer» C. Time Study
97.

In route sheet or operation layout, one has to show

A. A list of materials to be used.
B. A list of machine tools to be used.
C. Every work center and the operation to be done at that work center.
D. The cost of product.
Answer» D. The cost of product.
98.

Two important functions that are to be done by Production department are:

A. Forecasting
B. Costing
C. Scheduling and loading
D. Inspecting.
Answer» D. Inspecting.
99.

Which of the following process types is used when a very highly standardized productis desired in high volumes?

A. Repetitive Process
B. Batch Process
C. Project Process
D. Continuous Process
Answer» E.
100.

To determine where the plant should be located for maximum operating economyand effectiveness, refers to which one of the following?

A. Plant layout
B. Facility location
C. Capacity planning
D. Capacity requirement
Answer» C. Capacity planning