MCQOPTIONS
Saved Bookmarks
This section includes 1167 Mcqs, each offering curated multiple-choice questions to sharpen your Computer Science Engineering (CSE) knowledge and support exam preparation. Choose a topic below to get started.
| 701. |
Which is not a product metric?( |
| A. | Size |
| B. | Reliability |
| C. | Productivity |
| D. | Functionality |
| Answer» D. Functionality | |
| 702. |
------------it shows a two dimensional depicting system elements and their linkages. |
| A. | Schematic Models |
| B. | Flow system models |
| C. | Static system models |
| D. | Dynamic system models |
| Answer» B. Flow system models | |
| 703. |
Software requirements specification are |
| A. | A set of activities and associated results that produce a software product. |
| B. | It is concerned with re-implementing legacy system to make them more maintainable. |
| C. | It is the official statement of what is required of the system developers; it includes uses requirements for a system and detailed specification of the system requirements |
| D. | None of these. |
| Answer» D. None of these. | |
| 704. |
DFD shows how things happen or the physical component is called ------------ |
| A. | Logical DFD |
| B. | Physical DFD |
| C. | Data dictionary |
| D. | None of these |
| Answer» B. Physical DFD | |
| 705. |
----------- the degree to which the software assists in enabling new users to apply thesystem. |
| A. | Training |
| B. | Traceability |
| C. | Simplicity |
| D. | Security |
| Answer» B. Traceability | |
| 706. |
Which one is not infrastructure software?( |
| A. | Operating system |
| B. | Database management system |
| C. | Compilers |
| D. | Result management system |
| Answer» E. | |
| 707. |
Software implementation converts system specifications into |
| A. | Development system |
| B. | System decomposition |
| C. | Executable system |
| D. | None of these |
| Answer» D. None of these | |
| 708. |
Effectiveness is a major goal of these types of systems. |
| A. | Expert systems |
| B. | Closed system |
| C. | MIS |
| D. | DSS |
| Answer» B. Closed system | |
| 709. |
In system modeling : A-Classification model; B-Stimulus-response model; C-Data processing model: 1-Here data-flow diagram show how data is processed at different stages; 2-Here object class/inheritance diagram show, how entities have the common characteristics;3-Here state transition diagram shows the how the system reader to internal and external events |
| A. | A-2, B-3, C-1 |
| B. | A-3, B-1, C-2 |
| C. | A-1, B-2, C-3 |
| D. | A-1, B-3, C-2 |
| Answer» B. A-3, B-1, C-2 | |
| 710. |
It is concerned with making decision about the best way for an organization that acquire a system and deciding on the best suppliers of that system. |
| A. | System procurement |
| B. | System quality assessment |
| C. | System release management |
| D. | System reliability |
| Answer» B. System quality assessment | |
| 711. |
In system models, object is |
| A. | An entity that has a state and defined set of operations that operates on that state |
| B. | Software program |
| C. | Programming language, that develops any given program |
| D. | None of these |
| Answer» B. Software program | |
| 712. |
SDLC stands for( |
| A. | Software design life cycle |
| B. | Software development life cycle |
| C. | System development life cycle |
| D. | System design life cycle |
| Answer» C. System development life cycle | |
| 713. |
In McCall’s software quality factors, Product transition phase ----not conta |
| A. | Portability |
| B. | Reusability |
| C. | Interoperability |
| D. | Testability |
| Answer» E. | |
| 714. |
Spiral Model has high reliability requirements. |
| A. | True |
| B. | False |
| C. | all |
| D. | none |
| Answer» B. False | |
| 715. |
ERD stands for( |
| A. | Entity relationship diagram |
| B. | Exit related diagram |
| C. | Entity relationship design |
| D. | Exit related design |
| Answer» B. Exit related diagram | |
| 716. |
-----------system collect,store,modify and retrieve the transaction of an organization. |
| A. | Execution Information system(EIS) |
| B. | Integrated system |
| C. | Subsystem |
| D. | Transaction processing system |
| Answer» E. | |
| 717. |
.A data dictionary is created when a __________ created. |
| A. | Instance |
| B. | Segment |
| C. | Database |
| D. | Dictionary |
| Answer» D. Dictionary | |
| 718. |
FAST stands for( |
| A. | Functional Application Specification Technique |
| B. | Fast Application Specification Technique |
| C. | Facilitated Application Specification Technique |
| D. | None of the above |
| Answer» D. None of the above | |
| 719. |
What are Design Class Models? |
| A. | They show classes in a software system |
| B. | They represents attributes,operations, association in abstraction from language |
| C. | They show implementation details |
| D. | All of the mentioned |
| Answer» E. | |
| 720. |
Commonality |
| A. | It takes project, product hardware and personnel attributes into account when formulating a cost estimate. |
| B. | In it server provides set of services and set of clients uses these services. |
| C. | Extent to which standards are used to achieve interoperability |
| D. | None of these |
| Answer» D. None of these | |
| 721. |
Which of these comes under business activities? |
| A. | Project |
| B. | Operations |
| C. | Planning |
| D. | Project & Operations |
| Answer» E. | |
| 722. |
Risk management is now recognized as one of the most important project management tasks. |
| A. | true |
| B. | false |
| Answer» B. false | |
| 723. |
It is always best to start process analysis with a new test model. |
| A. | True |
| B. | False |
| C. | none |
| D. | all |
| Answer» C. none | |
| 724. |
Software engineering deals with |
| A. | Software development |
| B. | Hardware development |
| C. | System development |
| D. | Network development |
| Answer» B. Hardware development | |
| 725. |
) KPA in CMM stands for( |
| A. | Key Process Area |
| B. | Key Product Area |
| C. | Key Principal Area |
| D. | Key Performance Area |
| Answer» B. Key Product Area | |
| 726. |
User requirements are written in |
| A. | Natural language |
| B. | FORTRAN |
| C. | Assembly language |
| D. | None of these |
| Answer» B. FORTRAN | |
| 727. |
Which of these is wrong in terms of definition? |
| A. | Planing is formulating scheme for doing project |
| B. | Organizing is directing people doing project work |
| C. | Project is one time effort to achieve a particular goal for organization |
| D. | Staffing is filing the positions in an organizational structure |
| Answer» C. Project is one time effort to achieve a particular goal for organization | |
| 728. |
During validation( |
| A. | Process is checked |
| B. | Product is checked |
| C. | Developer’s performance is evaluated |
| D. | The customer checks the product |
| Answer» E. | |
| 729. |
In system modeling : A-Model;B-Prototype;;1- it’s an abstract view of a system that ignores system details; 2-It’s an initial version of system software which givers end-users a concrete impression of the system capacities |
| A. | A-1, B-2 |
| B. | A-1, B-1 |
| C. | B-1, A-2 |
| D. | A-2, B-2 |
| Answer» B. A-1, B-1 | |
| 730. |
Which one is a quality attribute?( |
| A. | Reliability |
| B. | Availability |
| C. | Security |
| D. | All of the above |
| Answer» E. | |
| 731. |
SRS stands for( |
| A. | Software requirements specification |
| B. | System requirements specification |
| C. | Systematic requirements specifications |
| D. | None of the above |
| Answer» B. System requirements specification | |
| 732. |
Cost of ownership is |
| A. | Process of estimating the costs associated with software development projects that include the effort, time, and labor required. |
| B. | Overall cost of maintaining a computer system that includes the costs associated with personnel/training/ maintenance of hardware and software/ requirements growth. |
| C. | Overall cost of operating a computer system that includes the costs associated with personnel / training / system operations. |
| D. | Overall cost of a computer system to an organization that includes the costs associated with operating/ maintaining the system, and the lifetime of operational use of the system. |
| Answer» E. | |
| 733. |
In Data tension |
| A. | It shows the software process as a set of activities each of which carries out data transformation. |
| B. | Data and associated programs are re- engineered to remove limits on the data processing |
| C. | It is responsible for the definition, operation, protection, performance, and recovery of a database. |
| D. | Development of a database to meet a user’s requirements |
| Answer» C. It is responsible for the definition, operation, protection, performance, and recovery of a database. | |
| 734. |
Extent to which a system or component makes efficient use of its data storage space- occupies a small volume. |
| A. | Compatibility |
| B. | Compactness |
| C. | Code |
| D. | Communication |
| Answer» C. Code | |
| 735. |
When is a system where each sub-system can respond to generated event are referred as ? |
| A. | Event driven control system |
| B. | Object oriented model |
| C. | Manager control model |
| D. | None of these |
| Answer» B. Object oriented model | |
| 736. |
Cost of operation is |
| A. | Process of estimating the costs associated with software development projects that include the effort, time, and labor required. |
| B. | Overall cost of maintaining a computer system that includes the costs associated with personnel / training/ maintenance of hardware and software/ requirements growth. |
| C. | Overall cost of operating a computer system that includes the costs associated with personnel / training / system operations. |
| D. | Overall cost of a computer system to an organization that includes the costs associated with operating/ maintaining the system, and the lifetime of operational use of the system. |
| Answer» D. Overall cost of a computer system to an organization that includes the costs associated with operating/ maintaining the system, and the lifetime of operational use of the system. | |
| 737. |
Classification model |
| A. | One system is designed as the system controller and has responsibility for managing the execution of other subsystems. |
| B. | Each system is named as in attribute- based identification and associated with one or more change requests. |
| C. | An object class inheritance diagram, how entities have common characteristics. |
| D. | The objective of this software develop- ment is zero-defect software. |
| Answer» D. The objective of this software develop- ment is zero-defect software. | |
| 738. |
Software engineering is an engineering discipline concerned with |
| A. | Software development |
| B. | Software production |
| C. | Software implementation |
| D. | All the above |
| Answer» E. | |
| 739. |
Software mistakes during coding are known as:( |
| A. | failures |
| B. | defects |
| C. | bugs |
| D. | errors |
| Answer» D. errors | |
| 740. |
------------- encompass a broad array of tasks that include project planning andestimation system analysis, design of data structure, program architecture, coding, testingand maintenance. |
| A. | Software engineering tools |
| B. | Software engineering Procedures |
| C. | Software engineering Methods |
| D. | None of these |
| Answer» B. Software engineering Procedures | |
| 741. |
The waterfall model of the software process considers each process activity as a_______ pha |
| A. | separate |
| B. | discrete |
| C. | Both a and b options |
| D. | None of the above |
| Answer» D. None of the above | |
| 742. |
Software maintenance is |
| A. | It is the general process of changing system after it has been delivered. The changes can be to correct coding error to correct design error, or adding new components to system. |
| B. | It is concerned with deriving a numeric value for some attribute of a software product or a software process. |
| C. | It is any type of measurement, which relates to software system, process and related documentation. |
| D. | None of these |
| Answer» B. It is concerned with deriving a numeric value for some attribute of a software product or a software process. | |
| 743. |
Which phase is not available in software life cycle?( |
| A. | Coding |
| B. | Testing |
| C. | Maintenance |
| D. | Abstraction |
| Answer» E. | |
| 744. |
Software metric is |
| A. | It is the general process of changing system after it has been delivered. The changes can be to correct coding error to correct design error, or adding new components to system. |
| B. | It is concerned with deriving a numeric value for some attribute of a software product or a software process. |
| C. | It is any type of measurement, which relates to software system, process and related documentation. |
| D. | None of these Software specification is |
| Answer» B. It is concerned with deriving a numeric value for some attribute of a software product or a software process. | |
| 745. |
Risk planning process |
| A. | Extent to which a software module can be used in more than one computing program |
| B. | It involves regular monitoring of the risks identified and of new risks that develops. |
| C. | It considers each of the key risks that are identified and identifies strategies to manage the risk. |
| D. | None of these |
| Answer» D. None of these | |
| 746. |
Which of the following represents the use of Conceptual models during product design? |
| A. | Understanding the problem design |
| B. | Setting Data Requirements |
| C. | Validating Requirements |
| D. | All of the mentioned |
| Answer» E. | |
| 747. |
If all tasks must be executed in the same time-span, what type of cohesion is beingexhibited? |
| A. | Functional Cohesion |
| B. | Temporal Cohesion |
| C. | Functional Cohesion |
| D. | Sequential Cohesion |
| Answer» C. Functional Cohesion | |
| 748. |
A generic software engineering design follows which of the activities? |
| A. | Analysis |
| B. | Architectural Design |
| C. | Finalize Design |
| D. | Analysis & Architectural Design |
| Answer» E. | |
| 749. |
---------- The damage that occurs when the program encounters an error. |
| A. | Error tolerance |
| B. | Training |
| C. | Traceability |
| D. | simplicity |
| Answer» B. Training | |
| 750. |
Program is( |
| A. | Subset of software |
| B. | super set of software |
| C. | Software |
| D. | none of the above |
| Answer» B. super set of software | |