This section includes 1 Mcqs, each offering curated multiple-choice questions to sharpen your Waste Water Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The first chamber in a septic tank should be at least ______ of the total length. |
| A. | t10 % |
| B. | t20 % |
| C. | t35 % |
| D. | t50 % |
| Answer» E. | |