This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Surveying knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Which of the following involves in the sequence of rocky strata? |
| A. | Marking profile |
| B. | Placing rocks |
| C. | Improving foul gases |
| D. | Recording values |
| Answer» B. Placing rocks | |
| 2. |
Which of the following can act as an alternative for blasting? |
| A. | Tunneling |
| B. | Continuous blasting |
| C. | Sequential blasting |
| D. | Fire-setting |
| Answer» E. | |
| 3. |
Which method can be adopted in case of rock tunneling? |
| A. | Full face method |
| B. | Benching |
| C. | Tracing |
| D. | Back bearing method |
| Answer» B. Benching | |
| 4. |
A steel cylinder which is pushed in the soft soil is determined as ________ |
| A. | Jar born |
| B. | Shield |
| C. | Rod |
| D. | Pole |
| Answer» C. Rod | |
| 5. |
Among the following, which can be adopted for providing support for soft strata? |
| A. | Bents of aluminum |
| B. | Bents of iridium |
| C. | Bents of steel |
| D. | Bents of plastic |
| Answer» D. Bents of plastic | |
| 6. |
Which method can be adopted if full face excavation is not possible? |
| A. | Back bearing method |
| B. | Plotting |
| C. | Trenching |
| D. | Benching |
| Answer» E. | |
| 7. |
Among the following, which doesn t belong to tunnel classification? |
| A. | Firm ground |
| B. | Running ground |
| C. | Rocky ground |
| D. | Soft ground |
| Answer» D. Soft ground | |
| 8. |
Which of the following should be considered while aligning a tunnel? |
| A. | Atmospheric conditions |
| B. | Hydrological conditions |
| C. | Climatic conditions |
| D. | Surface limits |
| Answer» C. Climatic conditions | |
| 9. |
The line at which the tunnel wall breaks from sloping outward can be given as _________ |
| A. | Spring line |
| B. | Oval line |
| C. | Centre line |
| D. | Middle line |
| Answer» B. Oval line | |
| 10. |
Tunneling is required in case of ____________ |
| A. | Laying pavement |
| B. | Laying road |
| C. | On ground passage |
| D. | Underground passage |
| Answer» E. | |