151.

The first activity of Purchasing cycle is

A. Communicating requirement to the purchase
B. Source Selection and development
C. Recognizing the need for procurement
D. Inspection of goods
Answer» D. Inspection of goods
152.

Production is the process by which raw materials and other inputs are converted in to.

A. Finished Product
B. Services
C. Satisfaction
D. Loyalty
Answer» B. Services
153.

In ABC analysis the category ‘A’ includes items with small quantity but high .

A. Weight
B. Value
C. density
D. None
Answer» C. density
154.

The 4Ms does not include .

A. Men
B. Material
C. Message
D. Machinery.
Answer» D. Machinery.
155.

5. All of the following decisions fall within the scope of operations management except for

A. financial analysis
B. Design of products and processes
C. location of facilities
D. Quality management
Answer» B. Design of products and processes
156.

Maintenance consist of the following action(s)

A. Replace of component
B. Repair of component
C. Service of component
D. All of the above
Answer» E.
157.

The following type of layout is preferred for low volume production of non standard products

A. Product layout
B. Process layout
C. Fixed position layout
D. Combination layout
Answer» C. Fixed position layout
158.

Raw Materials and WIP can be classified under

A. Indirect Material
B. Direct Material
C. Finished Material
D. Standard Parts
Answer» C. Finished Material
159.

In which type of production system the unit cost of production is low?

A. Combined production
B. Continuous production
C. Intermittent production
D. Custom production
Answer» C. Intermittent production
160.

Kaizen is a process, the purpose of which goes beyond simpleproductivity improvement.

A. weekly
B. daily
C. monthly
D. annual
Answer» C. monthly
161.

The following is (are) scheduled maintenance

A. Overhauling of machine
B. Cleaning of tank
C. Whitewashing of building
D. All of the above
Answer» E.
162.

The supply chain concept originated in what disci

A. marketing
B. Operation
C. Logistics
D. Production
Answer» B. Operation
163.

determination of the amount of time required to

A. Method
B. Motion
C. Work
D. Time
Answer» E.
164.

Which of the following industries should be located near the vicinity of raw materials?

A. Cycles
B. Televisions
C. Sewing machines
D. Steel mills
Answer» E.
165.

The competitive advantage in the production function can be achieved through .

A. A High wastage
B. More cost
C. Higher quality
D. Lowest quantity
Answer» D. Lowest quantity
166.

involves verifying the physical quantities of stores in hand.

A. Pricing of Issues
B. Material control
C. Stock taking
D. None
Answer» D. None
167.

. A encompasses all activities associated with the flow and transformation of goods from the raw material stage, through to the end user, as well as the associated

A. production line
B. supply chain
C. marketing channel
D. warehouse
Answer» C. marketing channel
168.

A is something which is offered to customers to satisfy their needs or wants.

A. Process
B. Price
C. Promotion
D. Product
Answer» E.
169.

. may be defined as the ratio between output and input.

A. Production
B. Productivity
C. Batch production
D. Job production.
Answer» C. Batch production
170.

In Production Management, at every next level some _______ is added to the previous level.

A. income
B. profit
C. loss
D. value
Answer» E.
171.

_________ is one of the quality of Production Manager.

A. quickness
B. sympathy
C. timeliness
D. integrated
Answer» C. timeliness
172.

___________ is one of the objective of Production Management.

A. right person
B. right cost
C. right quantity
D. continuous process
Answer» D. continuous process
173.

________ is one of the most important factor, required for production activities.

A. money
B. man-power
C. time
D. customer
Answer» C. time
174.

__________ is responsible for all the activities related to production of goods and services.

A. production person
B. production workers
C. production personnel
D. production manager
Answer» E.
175.

Production Manager must have __________ on wastages.

A. notice
B. choice
C. control
D. plan
Answer» D. plan
176.

___________ system is one of the type of Production System.

A. non-flow
B. intermittent
C. assembly lines
D. periodical
Answer» C. assembly lines
177.

The Production Manager, is also responsible for maintaining a specific ______ of the product.

A. quality
B. size
C. price
D. ability.
Answer» B. size
178.

__________ is a characteristic of good product design.

A. functionality
B. size
C. price
D. quantity
Answer» B. size
179.

The product design should be as per the customer’s _________.

A. price
B. requirements
C. desire’s
D. quality
Answer» C. desire’s
180.

Factors affecting Product Design includes _______ and ______ perspectives.

A. customer & price
B. customer & production
C. customer & organization
D. quality & quantity
Answer» D. quality & quantity
181.

________ is one of the parts of product policy of an organization.

A. product modification
B. product quantity
C. product quality
D. product development
Answer» B. product quantity
182.

___________ is concerned with developing specific course of action for production system.

A. production plant
B. production planning
C. production time
D. production system
Answer» C. production time
183.

__________ quality of production manager allows, him to adapt to changing situations.

A. intelligence
B. flexibility
C. sympathy
D. imagination
Answer» C. sympathy
184.

Production manager, should be a ________ person, which will enable him to do various innovative functions, in a well-planned manner.

A. enthusiasm
B. interested
C. self-control
D. flexibility
Answer» B. interested
185.

__________ is the process which helps in determining, where the plant should be located, for maximum operating economy and effectiveness.

A. plant layout
B. plant design
C. plant location
D. plant arrangement
Answer» D. plant arrangement
186.

__________ is the process of, creating a new product, which is to be sold by a business or enterprise to its customers.

A. modification
B. diversification
C. development
D. eliminate
Answer» D. eliminate
187.

Materials should be made available at right quantity, right place, right price and at right __________.

A. size
B. time
C. forecast
D. features
Answer» C. forecast
188.

In Manufacturing a product, cost can be kept within, control through _________ reduction.

A. profit
B. loss
C. wastage
D. time
Answer» D. time
189.

Better _________ of the product improves consumers satisfaction , this enhances the goodwill of the organization.

A. quantity
B. quality
C. shape
D. variations
Answer» C. shape
190.

__________ is the 2nd stage in Product Life Cycle.

A. introduction
B. maturity
C. growth
D. decline
Answer» D. decline
191.

___________ is a common measure of how well a country, industry, or business unit is using its resources (or factors of production).

A. production system
B. productivity
C. effectiveness
D. competition
Answer» C. effectiveness
192.

The term Ergonomics, is derived from _________ word.

A. latin
B. greek
C. spanish
D. japanese
Answer» C. spanish
193.

_________ is one of the importance of Productivity.

A. to beat the competition
B. to beat the price
C. to beat the time
D. to beat the system
Answer» B. to beat the price
194.

___________ is the science of designing, the job equipments & workplace to fit the workers.

A. economics
B. ergonomics
C. productivity
D. psychology
Answer» C. productivity
195.

A _____________ is something which is offered to customers to satisfy their needs or wants.

A. process.
B. price.
C. promotion.
D. product.
Answer» E.
196.

RPN in total quality management denotes _______.

A. risk priority number.
B. return priority number.
C. risk preference number.
D. return preference number.
Answer» B. return priority number.
197.

The term muda in TQM refers to ______ classes of waste.

A. six.
B. seven.
C. eight .
D. nine.
Answer» C. eight .
198.

Supplier rating system is also referred to as a _________used to obtain an over all rating of suppliers performance.

A. score card system.
B. open ended system .
C. credit card system .
D. sub system.
Answer» B. open ended system .
199.

Select the odd one which is not the dimension of quality?

A. response.
B. reliability.
C. reputation.
D. reassurance.
Answer» E.
200.

Performance appraisal is also known as ______.

A. merit rating.
B. quality rating .
C. credit rating.
D. critical rating.
Answer» B. quality rating .