MCQOPTIONS
Saved Bookmarks
This section includes 13 Mcqs, each offering curated multiple-choice questions to sharpen your Fluid Mechanics knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
What does FFT in vibration testing stand for? |
| A. | Fast Fourier Transformation |
| B. | Fast Foil Temperature |
| C. | Fast Foil Transformation |
| D. | Feature Fourier Transformation |
| Answer» B. Fast Foil Temperature | |
| 2. |
A test that is performed at different flow rates is__________ |
| A. | Casing inspection |
| B. | Casing hydrostatic test |
| C. | NPSH test |
| D. | Vibration test |
| Answer» E. | |
| 3. |
What does NPSH stand for? |
| A. | Net positive suction head |
| B. | Net positive super head |
| C. | Net planar suction head |
| D. | Non-planar suction head |
| Answer» B. Net positive super head | |
| 4. |
What does SME stand for? |
| A. | Subject mass export |
| B. | Subject mass expert |
| C. | Subject matter expert |
| D. | Subject matter export |
| Answer» D. Subject matter export | |
| 5. |
A_TEST_THAT_IS_PERFORMED_AT_DIFFERENT_FLOW_RATES_IS__________?$ |
| A. | Casing inspection |
| B. | Casing hydrostatic test |
| C. | NPSH test |
| D. | Vibration test |
| Answer» E. | |
| 6. |
What does FFT in vibration testing stand for?$ |
| A. | Fast Fourier Transformation |
| B. | Fast Foil Temperature |
| C. | Fast Foil Transformation |
| D. | Feature Fourier Transformation |
| Answer» B. Fast Foil Temperature | |
| 7. |
Which among the following is not a pump operating parameter? |
| A. | Power consumption |
| B. | Bearing temperature |
| C. | Density |
| D. | Shaft speed |
| Answer» D. Shaft speed | |
| 8. |
How long is the pump mechanical run test performed? |
| A. | 1 hour |
| B. | 2 hours |
| C. | 3 hours |
| D. | 4 hours |
| Answer» E. | |
| 9. |
What is the full form of SME in Model Testing Partially Submerged Bodies? |
| A. | Subject mass export |
| B. | Subject mass expert |
| C. | Subject matter expert |
| D. | Subject matter export |
| Answer» D. Subject matter export | |
| 10. |
The pump hydrostatic test is tested at __________ |
| A. | 2 times the maximum allowable work pressure |
| B. | 3 times the maximum allowable work pressure |
| C. | 5 times the maximum allowable work pressure |
| D. | 1.5 times the maximum allowable work pressure |
| Answer» E. | |
| 11. |
Which test is performed after the pump inspection? |
| A. | Casing inspection |
| B. | Casing hydrostatic test |
| C. | NPSH test |
| D. | Mechanical running test |
| Answer» C. NPSH test | |
| 12. |
The performance test is completed after completion of________ |
| A. | Casing inspection |
| B. | Regulation |
| C. | Pump enhancement |
| D. | Hydrostatic check |
| Answer» B. Regulation | |
| 13. |
What is model testing? |
| A. | Performance testing |
| B. | Partial testing |
| C. | Function testing |
| D. | Overall testing |
| Answer» B. Partial testing | |