| 1. |
Where the nodal point for National Measurement System is located? |
| A. | Bangalore |
| B. | Patna |
| C. | Bombay |
| D. | New Delhi |
| Answer» E. | |
| 2. |
Which of the following option is not correct regarding QA and QC? |
| A. | Process capabilities should be monitored on intermittent basis |
| B. | Measuring equipment’s must have a calibration certificate |
| C. | Normally many inspections are done during the process of manufacturing |
| D. | QA depends on the activities of the entire company |
| Answer» B. Measuring equipment’s must have a calibration certificate | |
| 3. |
Which of the following is an example of QA? |
| A. | Verification |
| B. | Software testing |
| C. | Validation |
| D. | Documentation |
| Answer» B. Software testing | |
| 4. |
What does QA and QC stand for? |
| A. | Quality Assurance and Queuing Control |
| B. | Quality Adjustment and Quality completion |
| C. | Quality Assurance and Quality control |
| D. | Quality Adjustment and Queuing control |
| Answer» D. Quality Adjustment and Queuing control | |
| 5. |
WHICH_OF_THE_FOLLOWING_IS_AN_EXAMPLE_OF_QA??$ |
| A. | Verification |
| B. | Software testing |
| C. | Validation |
| D. | Documentation |
| Answer» B. Software testing | |
| 6. |
Which_of_the_following_option_is_not_correct_regarding_QA_and_QC?$ |
| A. | Process capabilities should be monitored on intermittent basis |
| B. | Measuring equipment’s must have a calibration certificate |
| C. | Normally many inspections are done during the process of manufacturing |
| D. | QA depends on the activities of the entire company |
| Answer» E. | |
| 7. |
A-3, B-4, C-2, D-? |
| A. | A-2, B-3, C-1, D-4 |
| B. | A-1, B-3, C-4, D-2 |
| C. | A-4, B-1, C-3, D-2 |
| Answer» B. A-1, B-3, C-4, D-2 | |
| 8. |
What is the first step of QA? |
| A. | Development of standards |
| B. | Identification of customer need |
| C. | Servicing |
| D. | Material control |
| Answer» C. Servicing | |
| 9. |
Arrange the steps of QA in ascending order? |
| A. | Customer needs, material control, design development, process control, marketing |
| B. | Material control, process control, customer need, design development, finished product |
| C. | Customer needs, design development, material control, process control, finished product |
| D. | Material control, servicing, process control, material control, design development |
| Answer» D. Material control, servicing, process control, material control, design development | |
| 10. |
Which of the following option involves material and component control? |
| A. | Development of standards |
| B. | Development of specification |
| C. | Quality control |
| D. | Feedback |
| Answer» D. Feedback | |
| 11. |
Which of the following option is correct regarding QA and QC? |
| A. | QC is an integral part of QA |
| B. | QA is an integral part of QC |
| C. | QA and QC are independent to each other |
| D. | QC may or may not depend on QA |
| Answer» B. QA is an integral part of QC | |
| 12. |
What is QA? |
| A. | It is the measurement of degree to which a product satisfies the need |
| B. | Any systematic process used to ensure quality in the process |
| C. | Process of identifying defects |
| D. | It is a corrective tool |
| Answer» C. Process of identifying defects | |
| 13. |
What is the full form of QA And QC in Metrology Quality Assurance? |
| A. | Quality Assurance and Queuing Control |
| B. | Quality Adjustment and Quality completion |
| C. | Quality Assurance and Quality control |
| D. | Quality Adjustment and Queuing control |
| Answer» D. Quality Adjustment and Queuing control | |