This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Engineering Metrology knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Where the nodal point for National Measurement System is located? |
| A. | Bangalore |
| B. | Patna |
| C. | Bombay |
| D. | New Delhi |
| Answer» E. | |
| 2. |
Which of the following option is not correct regarding QA and QC? |
| A. | Process capabilities should be monitored on intermittent basis |
| B. | Measuring equipment s must have a calibration certificate |
| C. | Normally many inspections are done during the process of manufacturing |
| D. | QA depends on the activities of the entire company |
| Answer» B. Measuring equipment s must have a calibration certificate | |
| 3. |
Which of the following is an example of QA? |
| A. | Verification |
| B. | Software testing |
| C. | Validation |
| D. | Documentation |
| Answer» B. Software testing | |
| 4. |
What does QA and QC stand for? |
| A. | Quality Assurance and Queuing Control |
| B. | Quality Adjustment and Quality completion |
| C. | Quality Assurance and Quality control |
| D. | Quality Adjustment and Queuing control |
| Answer» D. Quality Adjustment and Queuing control | |