| 1. |
A gap of 0.3m is to maintained between cement bag and wall, while storing cement. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 2. |
Steam curing is adopted for: |
| A. | Precast structures |
| B. | Columns |
| C. | Beams |
| D. | Walls |
| Answer» B. Columns | |
| 3. |
Excess vibration during compacting can lead to: |
| A. | Bleeding |
| B. | Segregation |
| C. | High strength |
| D. | Air bubbles |
| Answer» C. High strength | |
| 4. |
Which is the best method for curing flat surfaces? |
| A. | Spraying water |
| B. | Placing wet gunny bags |
| C. | Applying curing compounds |
| D. | Stagnating water |
| Answer» E. | |
| 5. |
Concrete is generally placed on a: |
| A. | Form work |
| B. | Stand |
| C. | Mould |
| D. | Platform |
| Answer» B. Stand | |
| 6. |
WHICH_IS_THE_BEST_METHOD_FOR_CURING_FLAT_SURFACES??$ |
| A. | Spraying water |
| B. | Placing wet gunny bags |
| C. | Applying curing compounds |
| D. | Stagnating water |
| Answer» E. | |
| 7. |
Steam curing is adopted for:$ |
| A. | Precast structures |
| B. | Columns |
| C. | Beams |
| D. | Walls |
| Answer» B. Columns | |
| 8. |
Excess_vibration_during_compacting_can_lead_to:$ |
| A. | Bleeding |
| B. | Segregation |
| C. | High strength |
| D. | Air bubbles |
| Answer» C. High strength | |
| 9. |
A_gap_of_0.3m_is_to_maintained_between_cement_bag_and_wall,_while_storing_cement. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 10. |
Concrete is generally placed on a? |
| A. | Form work |
| B. | Stand |
| C. | Mould |
| D. | Platform |
| Answer» B. Stand | |
| 11. |
Compacting is done to: |
| A. | Place concrete on flat surface |
| B. | Remove air bubbles |
| C. | Place concrete on sloping surface |
| D. | Introduce air bubbles |
| Answer» C. Place concrete on sloping surface | |
| 12. |
In small works, concrete is transported using: |
| A. | Conveyer belts |
| B. | Pumps |
| C. | Pans |
| D. | Buckets |
| Answer» D. Buckets | |
| 13. |
How many types of machine mixers are available? |
| A. | 2 |
| B. | 5 |
| C. | 6 |
| D. | 3 |
| Answer» E. | |
| 14. |
What is the maximum height through which concrete can be poured? |
| A. | 0.1-0.6 m |
| B. | 0.8-1 m |
| C. | 0.5 m |
| D. | 2 m |
| Answer» C. 0.5 m | |
| 15. |
How many methods of batching are there? |
| A. | 2 |
| B. | 3 |
| C. | 5 |
| D. | 6 |
| Answer» B. 3 | |
| 16. |
Ready mix plant and central mix plant differ in: |
| A. | Transportation |
| B. | Setting time |
| C. | Properties |
| D. | Water addition |
| Answer» E. | |
| 17. |
Which process comes after batching in manufacture process? |
| A. | Transportation |
| B. | Placing |
| C. | Mixing |
| D. | Compacting |
| Answer» D. Compacting | |