MCQOPTIONS
Saved Bookmarks
This section includes 13 Mcqs, each offering curated multiple-choice questions to sharpen your Total Quality Management knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Which of the following is a workplace efficiency tool designed to combine product flow and information flow along with any other useful data? |
| A. | 5S |
| B. | Seven Wastes |
| C. | Value Stream Mapping |
| D. | Poka-Yoke |
| Answer» D. Poka-Yoke | |
| 2. |
Which of the following is a tool utilized to visually map the flow of production? |
| A. | Gemba |
| B. | Automation |
| C. | Value Stream Mapping |
| D. | Benchmarking |
| Answer» D. Benchmarking | |
| 3. |
Which of the following is not a benefit of SMED? |
| A. | Lower manufacturing cost |
| B. | Smaller lot sizes |
| C. | Lower inventory levels |
| D. | Larger lot sizes |
| Answer» E. | |
| 4. |
SMED aims to convert as many changeover steps as possible to external elements. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 5. |
SMED stands for Single-Minute Exchange of Dies. |
| A. | False |
| B. | True |
| Answer» C. | |
| 6. |
According to SMART goals, what does the letter T refer to? |
| A. | Time-based |
| B. | Train |
| C. | Tough |
| D. | Try |
| Answer» B. Train | |
| 7. |
According to SMART goals, what does the letter R refer to? |
| A. | Realistic |
| B. | Range |
| C. | Refrain |
| D. | Retain |
| Answer» B. Range | |
| 8. |
According to SMART goals, what does the letter A refer to? |
| A. | Abstract |
| B. | Attainable |
| C. | Ask |
| D. | Abstain |
| Answer» C. Ask | |
| 9. |
According to SMART goals, what does the letter M refer to? |
| A. | Multiple |
| B. | Measurable |
| C. | Magnitude |
| D. | Medium |
| Answer» C. Magnitude | |
| 10. |
According to SMART goals, what does the letter S refer to? |
| A. | Smart |
| B. | Standard |
| C. | Subject |
| D. | Specific |
| Answer» E. | |
| 11. |
Which lean philosophy says that things must be done right the first time and every time? |
| A. | Gemba |
| B. | Right First Time |
| C. | Poka-Yoke |
| D. | Kanban |
| Answer» C. Poka-Yoke | |
| 12. |
Which of the following is not a goal of lean audit? |
| A. | Improve overall efficiency |
| B. | Increase waste |
| C. | Reduce waste |
| D. | Lower production costs |
| Answer» C. Reduce waste | |
| 13. |
___ is a tool for monitoring how lean principles are working in an organization. |
| A. | Poka-yoke |
| B. | Andon |
| C. | Gemba |
| D. | Lean Audit |
| Answer» E. | |