MCQOPTIONS
Saved Bookmarks
This section includes 57 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 51. |
The site for an industrial estate should be close to perennial water supply. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 52. |
Industrial estates may be located outside the towns. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 53. |
The architect is usually the lead designer on buildings, with a structural engineer employed as a sub-consultant. |
| A. | False |
| B. | True |
| Answer» C. | |
| 54. |
Cracking of the concrete section is nearly impossible to prevent. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 55. |
High strength concrete is used in prestressed member? |
| A. | To ovecome bursting stresses at the ends |
| B. | To provide high bond stresses |
| C. | To overcome cracks due to shrinkage |
| D. | To overcome bursting stresses, provide high bond and overcome cracks |
| Answer» E. | |
| 56. |
To inhibit corrosion, at least 11% chromium is added to steel so that a hard oxide forms on the metal surface; this is known as_________________ |
| A. | ironless steel |
| B. | cast iron |
| C. | hard iron |
| D. | stainless steel |
| Answer» E. | |
| 57. |
Which is not a human factor of industrial location? |
| A. | Infrastructure |
| B. | Capital |
| C. | Labour |
| D. | Market |
| Answer» B. Capital | |