101.

___________ function helps in hiring the right people with the right skills.

A. recruitment management.
B. personnel administration.
C. personnel management.
D. organizational management.
Answer» B. personnel administration.
102.

During analysis it is important to investigate ____________ of the different packages.

A. effectiveness.
B. worth.
C. cost.
D. origin.
Answer» E.
103.

The _________________ are constantly striving to lower configuration costs.

A. vendors.
B. consultants.
C. management.
D. employees.
Answer» B. consultants.
104.

Market risk management plays a vital role in analyzing _______.

A. company\s growth.
B. company\s competitiveness.
C. company\s sales.
D. product quality..
Answer» C. company\s sales.
105.

Most ERP packages are stronger in _____ areas.

A. all.
B. less.
C. certain.
D. general.
Answer» D. general.
106.

______ is one of the objectives when selecting a ERP package.

A. accuracy.
B. flexibility.
C. project planning.
D. gap analysis.
Answer» C. project planning.
107.

To evaluate the process during implementation ______ is essential.

A. executive committee.
B. top management.
C. consultation.
D. evaluation committee.
Answer» E.
108.

______ process decides the success or failure of the project.

A. handling the vendors.
B. role of technology.
C. selection process.
D. implementation.
Answer» D. implementation.
109.

In the initial stages ERP packages were targeted at ________ industry.

A. manufacturing.
B. non-manufacturing.
C. both manufacturing and non-manufacturing.
D. service oriented industry.
Answer» B. non-manufacturing.
110.

ERP packages are ________ and set of functionalities.

A. same architecture.
B. different architecture.
C. same concept.
D. different concept.
Answer» C. same concept.
111.

________ is one of the activities in getting down to work.

A. analyses existing system.
B. analyses above new system.
C. identifying roles.
D. document the new procedures.
Answer» E.
112.

The end-user and managers are trained ______.

A. during implementation.
B. after implementation.
C. before implementation.
D. during and after implementation.
Answer» E.
113.

Which phase is most difficult phase in ERP implementation?

A. getting down to work.
B. going live.
C. post implementation.
D. configuration.
Answer» B. going live.
114.

During the second phase of ERP implementation _______ will be created.

A. model of existing system.
B. data design.
C. module design.
D. prototype.
Answer» E.
115.

All basic definitions of information and data modeling will be made in ______ phase.

A. pre-implementation.
B. post implementation.
C. defining solutions.
D. going live.
Answer» D. going live.
116.

Which is the most critical phase in ERP implementation?

A. understanding the problem.
B. defining solutions.
C. getting down to work.
D. going live.
Answer» C. getting down to work.
117.

_________ should determine the characteristic of the current system before implementation.

A. decision makers.
B. project team members.
C. decision makers and project team members.
D. management.
Answer» D. management.
118.

Which is the first phase in ERP implementation?

A. understanding the problem.
B. defining solutions.
C. getting down to work.
D. going live.
Answer» B. defining solutions.
119.

In which phase, data conversion is done?

A. going live.
B. testing.
C. training.
D. configuration.
Answer» B. testing.
120.

Generally an ERP implementation can be divided into _________ phases.

A. 1
B. 2
C. 3
D. 4
Answer» B. 2
121.

_______ is the last phase in ERP implementation life cycle.

A. testing.
B. end user training.
C. post implementation.
D. going live.
Answer» D. going live.
122.

In which phase the actual users of the system will be given training on how to use the system?

A. gap analysis.
B. reengineering.
C. implementation team training.
D. end user training.
Answer» E.
123.

The test cases must be decided specifically to find the _________ in the system.

A. methods.
B. real cases.
C. weak links.
D. loops.
Answer» D. loops.
124.

Baan company users an automated configuration tool is known as _______.

A. industry specific templates.
B. orgware.
C. complete solutions.
D. automatic updation.
Answer» C. complete solutions.
125.

The _________ approach emphasizes the human element of necessary change within organizations.

A. olap.
B. data mining.
C. data warehousing.
D. bpr.
Answer» E.
126.

The ________ team normally includes hired consultants and the in-house team.

A. work team
B. project management team.
C. executive committee.
D. all the above.
Answer» B. project management team.
127.

Normally the ERP package needs ________ of company's functional requirements.

A. 50%.
B. 60%.
C. 80%.
D. 100%.
Answer» D. 100%.
128.

The project planning phase will be headed by _______.

A. management.
B. vendor.
C. erp in-charge.
D. consultant.
Answer» D. consultant.
129.

In ___________ phase roles are identified and responsibilities assigned.

A. project planning.
B. gap analysis.
C. reengineering.
D. configuration.
Answer» B. gap analysis.
130.

What is the strategy of package evaluation?

A. trail and error.
B. accept with error.
C. do it right the first time.
D. take it as a trial.
Answer» D. take it as a trial.
131.

Baan company is strong in ________.

A. manufacturing.
B. hr.
C. plant and maintenance.
D. finance.
Answer» B. hr.
132.

PeopleSoft is strong in ________.

A. manufacturing.
B. hr.
C. plant and maintenance.
D. finance.
Answer» C. plant and maintenance.
133.

In pre-selection phase, _______ packages will be selected.

A. 5.
B. 10.
C. 15.
D. more than 15.
Answer» B. 10.
134.

ERP implementation process has _______ phases.

A. one.
B. two.
C. five.
D. eleven.
Answer» E.
135.

The company should conduct a _________ about the implementation and implementation strategies.

A. feasibility study.
B. survey.
C. case study.
D. test.
Answer» B. survey.
136.

ASAP road-map is a detailed project plan by _______ that describes all activities in an implementation.

A. sap.
B. oracle.
C. peoplesoft.
D. baan.
Answer» B. oracle.
137.

The cost of ERP is ________.

A. depends on the package.
B. depends on available resources.
C. technology used
D. all the above.
Answer» E.
138.

ERP system is for _______.

A. major departments only. .
B. entire organization.
C. marketing and sales.
D. production department
Answer» C. marketing and sales.
139.

Most organizations are implementing or planning to implement __________.

A. packaged software solution.
B. separate software solution.
C. simple software.
D. complex software.
Answer» B. separate software solution.
140.

The _________ model fails in creating the integrated information environment in business.

A. traditional information.
B. modern information.
C. erp.
D. computerized.
Answer» B. modern information.
141.

The three performance related measures are _________.

A. system, hardware and software.
B. quality, quantity and product design.
C. cost, time and benefits.
D. hardware, software and product design.
Answer» D. hardware, software and product design.
142.

________ is group of people with common goal.

A. department
B. system.
C. resource.
D. enterprise.
Answer» E.
143.

The three fundamental characteristics of information are ________.

A. accuracy, relevancy and timeliness.
B. quality, quantity and process.
C. accuracy, quality and relevancy.
D. quality, accuracy and timeliness.
Answer» B. quality, quantity and process.
144.

The main drawback of legacy system is ________.

A. less effectiveness.
B. high cost.
C. no integration.
D. more modules.
Answer» D. more modules.
145.

The companies can use supply chain management for ________.

A. critical business process.
B. effective planning.
C. inventory control.
D. material management.
Answer» B. effective planning.
146.

_________ is a track-proven technology applicable to every company.

A. olap.
B. supply chain management.
C. data mining.
D. data warehousing.
Answer» C. data mining.
147.

_________ is one of the benefits of supply chain management.

A. easy process.
B. manufacturing make-to-stock products.
C. minimum time.
D. faster response-to-market changes.
Answer» E.
148.

Expand DRP.

A. data reprocessing.
B. descriptive requirements planning.
C. distribution requirements planning.
D. data requirements planning.
Answer» D. data requirements planning.
149.

The computation of the _________ is one of the most complex calculations.

A. forecast.
B. production.
C. sales.
D. planning.
Answer» B. production.
150.

OLAP databases must be able to do more than ________.

A. complex aggregation.
B. expected result.
C. simple aggregation.
D. derived result.
Answer» D. derived result.