| 1. |
IF_RAPID_SWEEP_WITH_LEFT_HAND_BY_SURVEYOR_THEN_ACTION_BY_ASSISTANT_IS_________?$ |
| A. | Move slowly to the left |
| B. | Move considerably to the left |
| C. | Continue to move to the left |
| D. | Plumb the rod to the left |
| Answer» C. Continue to move to the left | |
| 2. |
Left arm up and moved to the left by the surveyor then action of assistant should be __________$ |
| A. | Move slowly to the left |
| B. | Move considerably to the left |
| C. | Continue to move to the left |
| D. | Plumb the rod to the left |
| Answer» E. | |
| 3. |
If_left_hand_is_extended_by_surveyor_then_action_by_the_assistant_should_be__________$ |
| A. | Move slowly to the left |
| B. | Move considerably to the left |
| C. | Continue to move to the left |
| D. | Plumb the rod to the left |
| Answer» D. Plumb the rod to the left | |
| 4. |
The chainmen keeps both the handles in the right hand and throws the rest of the portion of the chain in the forward direction with his right hand to ________? |
| A. | Mark the chain |
| B. | Line the chain |
| C. | Unfold the chain |
| D. | Fold the chain |
| Answer» D. Fold the chain | |
| 5. |
The more experienced of the chainmen should be ________ |
| A. | Rear end |
| B. | Intermediate end |
| C. | Final end |
| D. | Leader |
| Answer» B. Intermediate end | |
| 6. |
If both hands above head and then brought down by the surveyor then the action of assistant is _________ |
| A. | Move slowly forward |
| B. | Move considerably backward |
| C. | Correct |
| D. | Wrong |
| Answer» C. Correct | |
| 7. |
Right arm up and moved to the right by the surveyor then the action of assistant should be ________ |
| A. | Move slowly to the right |
| B. | Move considerably to the right |
| C. | Continue to move to the right |
| D. | Plumb the rod to the right |
| Answer» E. | |
| 8. |
If right hand extended by surveyor then action by the assistant should be ______ |
| A. | Move slowly to the right |
| B. | Move considerably to the right |
| C. | Continue to move to the right |
| D. | Plumb the rod to the right |
| Answer» D. Plumb the rod to the right | |
| 9. |
If rapid sweep with right hand signaled by surveyor then action by the assistant is _______ |
| A. | Move slowly to the right |
| B. | Move considerably to the right |
| C. | Continue to move to the right |
| D. | Plumb the rod to the right |
| Answer» C. Continue to move to the right | |
| 10. |
Direct ranging is done when the two ends of the survey lines are _______ |
| A. | Invisible |
| B. | Intervisible |
| C. | Visible from a particular point |
| D. | Faraway from each other |
| Answer» C. Visible from a particular point | |
| 11. |
Process of fixing or establishing intermediate points is known as _______ |
| A. | Chaining |
| B. | Ranging |
| C. | Contouring |
| D. | Levelling |
| Answer» C. Contouring | |