| 1. |
__________ masonry occupies an intermediate position between rubble masonry and ashlar masonry. |
| A. | Rubble block in a course |
| B. | Ashlar rubble in course |
| C. | Ashlar block in a course |
| D. | Rubble ashlar in course |
| Answer» D. Rubble ashlar in course | |
| 2. |
Time elapsed from the instance of adding water until paste ceases to behave as fluid is called: |
| A. | Initial setting time |
| B. | Final setting time |
| C. | Intermediate setting time |
| D. | Absolute setting time |
| Answer» B. Final setting time | |
| 3. |
________ is a term used that prevents the needle from pointing to the magnetic North in a given locality. |
| A. | Local attraction |
| B. | Declination |
| C. | Deviation |
| D. | Local distraction |
| Answer» B. Declination | |
| 4. |
In Herringbone bond, bricks are placed at _________ angle from __________ line in both directions. |
| A. | 600, central |
| B. | 600, vertical |
| C. | 450, central |
| D. | 450, vertical |
| Answer» D. 450, vertical | |
| 5. |
Contour Maps are not mandatory in civil engineering projects like road works, dams, canals,etc. |
| A. | True |
| B. | False |
| Answer» C. | |
| 6. |
What should be placed at the beginning of every header course in English bond to avoid vertical joint? |
| A. | Queen closer |
| B. | Half bat |
| C. | Three fourth bat |
| D. | Three fourth bat |
| Answer» B. Half bat | |
| 7. |
________ door swings both ways. |
| A. | Mead |
| B. | Dutch |
| C. | Garden |
| D. | French |
| Answer» B. Dutch | |