This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
FOR_COST_ESTIMATING,__________SERVES_AS_AN_IMPORTANT_FRAMEWORK_FOR_ORGANIZED_COLLECTION_PROJECT_COST_DATA_AND_PREPARING_THE_COST_ESTIMATES_AT_DIFFERENT_LEVELS.?$ |
| A. | WCS |
| B. | WPS |
| C. | WMS |
| D. | WBS |
| Answer» E. | |
| 2. |
The total project cost consists of two components namely front cost and indirect cost.$ |
| A. | True |
| B. | False |
| Answer» C. | |
| 3. |
Generally for any construction project, three parties are involved namely owner, design professionals and construction professionals.$ |
| A. | True |
| B. | False |
| Answer» B. False | |
| 4. |
A______________ may be included in an estimate to provide for unknown costs which are indicated as likely to occur by experience, but are not identifiable? |
| A. | approximate |
| B. | improbability |
| C. | contingency |
| D. | certainty |
| Answer» D. certainty | |
| 5. |
The measurement is made for stone work in square metre in case of __________ |
| A. | wall facing |
| B. | columns, lintels, copings |
| C. | fotings |
| D. | building work |
| Answer» B. columns, lintels, copings | |
| 6. |
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is ________ |
| A. | 0.90 m<sup>3</sup> |
| B. | 0.94 m<sup>3</sup> |
| C. | 0.98 m<sup>3</sup> |
| D. | 0.98 m<sup>3</sup> |
| Answer» C. 0.98 m<sup>3</sup> | |
| 7. |
The area of a sloping surface of a protective embankment of mean height d, side slopes S: 1 and length L is _________ |
| A. | d x d x s |
| B. | (d2 x (ds)2)1/2 |
| C. | L.D (1 + s2)1/2 |
| D. | 2 L.D (1 + s2)1/2 |
| Answer» D. 2 L.D (1 + s2)1/2 | |
| 8. |
According to ISI method of measurement, the order of the sequence is ___________ |
| A. | length, breadth, height |
| B. | breadth, height, Length |
| C. | height, Length, breadth |
| D. | width, Length, breadth |
| Answer» B. breadth, height, Length | |
| 9. |
Which is not a transaction type of Public work office grouped under? |
| A. | Expenditure heads |
| B. | Revenue heads |
| C. | Remittance heads |
| D. | Credit heads |
| Answer» E. | |
| 10. |
In P.W.D who is the primary disbursing officer who is supplied with cheque books on district treasuries of India. |
| A. | S.D.O’s |
| B. | Divisional officer |
| C. | Chief Minister |
| D. | Manager of bank |
| Answer» C. Chief Minister | |