Workout the quantity of earthwork for an embankment 150 m long and 10 m wide at the top. Slide slop is 2:1 and depths at each 30 m intervals are 1.2, 1.4, 1.4, 1.6, 0.60, 1.6 m. |
| A. | 3572.9 m<sup>3</sup> |
| B. | 4563.7 m<sup>3</sup> |
| C. | 2572.8 m<sup>3</sup> |
| D. | 2590.0 m<sup>3</sup> |
| Answer» D. 2590.0 m<sup>3</sup> | |