Workout the quantity of earthwork for an embankment 150 m long and 10 m wide at the top. Slide slop is 2:1 and depths at each 30 m intervals are 1.2, 1.4, 1.4, 1.6, 0.60, 1.6 m.

A. 3572.9 m<sup>3</sup>
B. 4563.7 m<sup>3</sup>
C. 2572.8 m<sup>3</sup>
D. 2590.0 m<sup>3</sup>
Answer» D. 2590.0 m<sup>3</sup>