| 1. |
*/*_"Which of the following would explain an adverse variable production overhead efficiency variance?1 Employees were of a lower skill level than specified in the standard2 Unexpected idle time resulted from a series of machine breakdown3 Poor Quality material was difficult to process"? |
| A. | (1), (2) and (3) |
| B. | (1) and (2) |
| C. | (2) and (3) |
| D. | (1) and (3) |
| Answer» E. | |