| 1. |
When the batching of material is done by weight |
| A. | the bucket in which the material is to be weighed should be cleaned thoroughly |
| B. | the weighing machine should be levelled before placing the material |
| C. | the chart should be prepared indicating the weight of each material used for different strengths of concrete |
| D. | all of the above |
| Answer» E. | |