MCQOPTIONS
Saved Bookmarks
| 1. |
When a given block of energy is charged at a specified rate and the succeeding block of energy are charged at progressively reduced rates, it is called: |
| A. | Maximum demand tariff |
| B. | Two-part tariff |
| C. | Power factor tariff |
| D. | Block rate tariff |
| Answer» E. | |