The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to complete the project using the effort formula of basicCOCOMO given below:E = a(KLOC)bAssume that the values of a and b are 2.5 and 1.0 respectively. |
| A. | 25 person months |
| B. | 75 person months |
| C. | 62.5 person months |
| D. | 72.5 person months |
| Answer» D. 72.5 person months | |