MCQOPTIONS
Saved Bookmarks
| 1. |
The most suitable location of canal head work is: |
| A. | Rock stage of the river |
| B. | Boulder stage of the river |
| C. | Trough stage of the river |
| D. | Delta stage of the river |
| Answer» D. Delta stage of the river | |