MCQOPTIONS
Saved Bookmarks
| 1. |
The lower a project's beta, the _______ is the project's _________ risk. |
| A. | lower; systematic |
| B. | lower; unsystematic |
| C. | higher; systematic |
| D. | higher; unsystematic |
| Answer» B. lower; unsystematic | |