MCQOPTIONS
Saved Bookmarks
| 1. |
The cost structure of proposed project must consider _________________. |
| A. | Cost of Material Inputs |
| B. | Labour Costs |
| C. | Factory Overheads |
| D. | All of these |
| Answer» E. | |