MCQOPTIONS
Saved Bookmarks
| 1. |
The budgeted variable overhead rate is multiplied to actual quantity of allocation base to calculate variable manufacturing cost of overheads in |
| A. | direct costing method |
| B. | indirect costing method |
| C. | actual costing method |
| D. | normal costing method |
| Answer» E. | |